🇵🇾 The Yguazu substation has a 1.2 GW capacity, drawing from the second largest hydroelectric dam on the planet.
Last week, SVP of Mining Operations Alex Brammer @AB_Brammer, CEO Ben Gagnon @hashoveride, and the Operations and Infrastructure teams were there to plan our site’s electrification⚡️
When fully online, Bitfarms’ Yguazu data center will boast 200 MW of renewable energy.
#Bitcoin #BitcoinMining #AI $BITF